  • Construction Progress
    July 2016



  • The structural works for Building A level 2 and Building B level 3 are completed, Building C、Building E and Building F have reached to level 5、level 5 and level 6 respectively, Building D level 6 is almost completed and work on roof has started. The installation of internal wall framing for each building are in progress.

0701_2
IMG_0496
IMG_0484
IMG_0480
IMG_0481
IMG_0492

  • Construction Progress
    June 2016



  • The structural works for Building A ground floor and Building B level 2 are completed, Building C、Building E and Building F have reached to level 5、level 5 and level 4 respectively, Building D level 6 is almost completed and work on roof has started. The installation of the services are almost completed from the Basements and Podiums.

full
a - Copy
c
d
e
f
p
base
base2

  • Construction Progress
    May 2016



  • The structural works for Building A ground floor and Building B level 1 are ongoing, Building C level 3 has been completed, Building D、Building E  and Building F have reached to level 6、Level 3 and level 4 respectively. The installation of the services are almost completed from the Basements and Podiums.

0506_1
20160506 (11)
c
d
e
f
inside
20160506 (10)

  • Construction Progress
    April 2016



  • The structural works for Building A has started from the ground floor, for Building B ground floor is on-going, for Level 2 of Building C, Building E, and Building F, and level 4 of Building D are almost completed. The installation of the services is on-going from the basement.

IMG_9622
IMG_9663
IMG_9664
IMG_9624
IMG_9641

  • Construction Progress
    March 2016



  • The structural works from level 1 to level 2 of Building C, Building E, and Building F are almost completed. Also the structural work for Building D has reached to level 4, for the ground floor of Building B is on-going. The installation of the services is on-going from the basement.

2-1-16
2-2-16
2-3-16
2-4-16

  • Construction Progress
    February 2016



  • The structural works from ground level to level 1 of Building D, Building E, Building C and Building F are completed. Also the structural work of Building D has reached to level 3. The installation of the services is ongoing from the basement.

1-1-16
1-2-16
1-3-16
1-4-16
1-5-16

  • Construction Progress
    January 2016



  • The structural works from ground level to level 1 of Building D, Building E, Building C and Building F are ongoing. Also the structural work from level 1 to level 2 of Building D is ongoing.

12-1
12-5
12-3
12-4
12-2

  • Construction Progress
    December 2015



  • The structural works above the ground floor of Building E started, while Building D started the floor slab structure of Level 1.

11-4
11-1
11-2
11-3

  • Construction Progress
    November 2015



  • The structural work above the ground floor of Building D started, block works started at the same time.

10-1-15
10-2-15
10-3-15
10-4-15

  • Construction Progress
    October 2015



  • All the structural works below ground level are finished, and remedy works of the basement is underway. Also the back fill work is carrying on.